HDD (extract)

 

 

 

 

Year: 2012

Client: terranets

 

Planning “Buga 2019” (culverts)

Status analysis and preliminary planning with rough estimation

 

 

 

 

Year:    2011-2012

Client: NEW Netz GmbH


Flood control basin Geneicken”: HDD for a drinking water pipeline OD 400, phases 3, 5 and 6 HOAI, site supervision

 

 

 

 

Year:   2011

Client: TenneT Offshore GmbH


Site supervision DolWin1 for the horizontal directional drillings 

 

 

 

 

Year:        2010

Client: transpower offfshore gmbh

 

Site supervision and documentation of the submarine cable laying Offshore Wind-Energy-Park BorWin 2

 

 

 

 

 

Year:   2009

Client: transpower offshore gmbh

 

Site supervision and documentation of the submarine cable laying Offshore Wind-Energy-Park BorWin 1

 

 

 

 

 

 

Year:    2008-2011

Client: Stadtwerke Hamm GmbH

 

Feasibility study and site supervision district heat pipeline below the “Datteln-Hamm-Kanal” and the river "Lippe" (length 420 m). The culvert consists of a casing pipe OD 500, a mediapipe OD 250 and a PEHD pipe OD160.

 

 

 

 

 

Year:        2008-2009

Client: BS|Energy

 

Planning and site supervision for the district heat pipeline „Gifhorner Straße – Steinriederdamm“.

Planungsgesellschaft für

Rohrvortrieb und Dükerbau

 

Mitglied der Unternehmensgruppe BPM Ingenieure